Skip to contents

Self-contained image registration for 3D volumes, implemented purely in RcppEigen (no other external registration library). It mirrors the core behavior of 'ANTs' antsRegistration: a multi-resolution, physical-shift scaled gradient-descent optimizer driving a similarity metric, working entirely in the anatomical RAS (right-anterior-superior) space. Each volume carries its own vox2ras (0-indexed voxel index to anatomical RAS) \(4\times 4\) transform, so volumes with different sampling, orientation, or field of view are aligned correctly.

Usage

register_volume3d(
  source,
  target,
  source_vox2ras = NULL,
  target_vox2ras = NULL,
  source_mask = NULL,
  target_mask = NULL,
  source_points = NULL,
  target_points = NULL,
  points_weight = 0.5,
  weights = NULL,
  type = c("rigid", "affine", "syn", "syn_only"),
  metric = "mattes",
  shrink_factors = c(4, 2, 1),
  smoothing_sigmas = c(2, 1, 0),
  iterations = c(1000, 500, 250),
  sampling_rate = 0.2,
  interpolation = "trilinear",
  number_of_bins = 32L,
  seed = 1L,
  init_transform = NULL,
  syn_iterations = c(40, 20, 0),
  syn_sigma = 3,
  syn_grad_step = 0.2,
  syn_total_sigma = 0,
  syn_cc_radius = 2L,
  syn_convergence = 1e-06,
  syn_convergence_window = 10L,
  syn_metric = NULL,
  syn_mi_bins = 32L,
  syn_mi_sampling = 0.25,
  syn_channel_combination = c("sum", "normalized"),
  syn_symmetric = FALSE,
  verbose = TRUE
)

Arguments

source

the moving volume to be aligned, a 3D array (for example a 'CT'); the result transform maps target into this image's space. May also be a list of already co-registered 3D arrays (multiple modalities such as 'T1', 'T2', an atlas constraint); all source channels must share the same dimensions and vox2ras

target

the fixed/reference volume to align to, a 3D array (for example a 'MRI'), or a list of co-registered arrays matching source channel-for-channel

source_vox2ras, target_vox2ras

4x4 (or 3x4) matrices mapping the 0-indexed voxel coordinate (column-row-slice, 'C'-style starting from 0, complying with 'NIfTI') to the RAS coordinate system; if NULL, the function looks for a "vox2ras" attribute on the array

source_mask, target_mask

optional 3D mask arrays restricting where the metric is evaluated; default NULL (no mask, evaluate everywhere). A target_mask (on the target/fixed grid, same dimensions as target) limits which target voxels drive the registration; a source_mask (on the source/moving grid) drops samples that map outside it. Non-zero voxels are included. Besides focusing the alignment on a region of interest, masks speed things up by skipping background: the linear stage samples only inside the mask, and the deformable stage skips warping voxels outside the (dilated) mask. One mask per grid, shared across channels

source_points, target_points

optional N x 3 matrices of corresponding landmark coordinates that add a surface/landmark term to the deformable ("syn"/"syn_only") stage; default NULL (no term). Row i of target_points (in the target/fixed RAS) and row i of source_points (in the source/moving RAS) must be the same anatomical location, for example corresponding cortical-surface vertices from a 'FreeSurfer' spherical registration. The term pulls the warp of each target point onto its source correspondent, recovering cortical folding (gyrification) that the intensity metric blurs over, while the image metric still drives deep-brain subcortical structures. Must be supplied together with equal row counts. Points must be in the same RAS frame as source_vox2ras/target_vox2ras (note 'FreeSurfer' surfaces use surface/tkr RAS, which differs from scanner RAS by c_ras)

points_weight

relative weight of the landmark term against the image metric in the deformable stage; default 0.5. Larger values follow the landmarks more closely. The sparse landmark force is attenuated by syn_sigma smoothing, so this typically needs tuning for a given point count and spacing

weights

optional numeric weights, one per source/target pair, controlling each channel's contribution to the deformable cost; default is equal weighting. Weights are normalized internally to sum to 1. Only the deformable ("syn"/"syn_only") stage is multivariate; the linear stage always uses the first (primary) pair

type

type of transform to estimate; one of 'rigid' (6 degrees of freedom), 'affine' (12), "syn" (affine followed by a SDR - symmetric diffeomorphic deformation), or 'syn_only' (deformable stage only — no affine is estimated; init_transform is used directly as the starting affine, useful when you already have a good linear alignment)

metric

similarity metric of the rigid and affine stages: "mattes" (Mattes mutual information, the default, best for cross-modal such as 'CT'-'MRI'), "cc" (normalized cross-correlation, for same-modality), or "meansquares" (mean squared intensity difference). Those stages use the first pair only, so with multiple channels only the first entry drives them; a single value is recycled to every pair, and one value per pair is accepted. In the deformable stage, while syn_metric is NULL, each entry only chooses between local cross-correlation ("mattes" or "cc") and mean squares ("meansquares") for its pair: "mattes" never gives mutual information there. Use syn_metric to set the deformable metric of each pair

shrink_factors

integer down-sampling factors, one per resolution level (coarsest first); default c(4, 2, 1)

smoothing_sigmas

Gaussian smoothing applied at each level, in voxels, same length as shrink_factors; default c(2, 1, 0)

iterations

maximum optimizer iterations per level; default c(1000, 500, 250)

sampling_rate

fraction of fixed voxels sampled to evaluate the metric of the rigid and affine stages (speeds up large volumes); default 0.2. The deformable stage does not use it: see syn_mi_sampling for its "mattes" channels

interpolation

output interpolation used when warping each modality onto the target grid: 'trilinear' (default), 'nearest' (keeps label or segmentation values intact), or "bspline" (cubic Catmull-Rom, higher quality, slower). Like metric, supply a single value (applied to every channel) or one per source/target pair. This affects only the returned warped images, never the optimization's internal sampling (always 'trilinear', so every channel still produces smooth gradients)

number_of_bins

number of histogram bins of the "mattes" metric in the rigid and affine stages; default 32. The "mattes" channels of the deformable stage use syn_mi_bins

seed

random seed for the voxel sampler, for reproducibility

init_transform

optional 4x4 initial RAS-to-RAS transform (fixed to moving) to start from

syn_iterations, syn_sigma

deformable stage controls (only used when type = "syn" or "syn_only"): per-level iteration counts (the maxima: with syn_convergence, a level ends earlier once its cost stops decreasing) and the Gaussian regularization sigma (in voxels) applied to the update field. Both are recycled to the number of levels, so syn_sigma may be a vector to vary the regularization per stage (e.g. c(3, 3, 1) to relax it at the finest level for sharper detail)

syn_grad_step

deformable stage step size: each update is capped at syn_grad_step times the voxel spacing of the current level; default 0.2 (must be positive)

syn_total_sigma

Gaussian sigma (in voxels) applied to the total deformation field after each update (the elastic-like regularization of 'ANTs' SyN[gradStep, updateFieldSigma, totalFieldSigma]); default 0 (none; must be non-negative)

syn_cc_radius

radius (in voxels) of the local window of the deformable-stage cross-correlation metric; default 2L (a \(5^3\) window; must be an integer of at least 1)

syn_convergence, syn_convergence_window

convergence stop of each deformable level, with the rule of 'ANTs' (--convergence [syn_iterations,syn_convergence,syn_convergence_window]): the threshold, a single finite number (default 1e-6), or NULL to run every iteration of syn_iterations; and the window, the number of recent iterations whose cost trend is tested (an integer of at least 2; default 10L). The defaults are those of antsRegistration; the "SyN" transforms of 'ANTsPy' use 1e-7 and 8L. See ‘Details’

syn_metric

metric of each channel in the deformable stage: "cc" (local cross-correlation with radius syn_cc_radius), "mattes" (Mattes mutual information, as the MI metric of 'ANTs') or "meansquares"; a single value is recycled to every channel. The default NULL keeps the behavior of metric: local cross-correlation, or mean squares where metric is "meansquares". When given, it replaces that choice, and metric then only sets the rigid and affine stages. The force of "mattes" differs from that of ITK in one term: it takes the joint histogram relative to the target histogram (the gradient of the joint entropy), not the source histogram, as the exact derivative does; with the source histogram, the one-sided update kept moving aligned images

syn_mi_bins, syn_mi_sampling

histogram bins (an integer of at least 8; default 32L) and the fraction of the voxels of each level that are sampled at random (seeded by seed; greater than 0 and at most 1, default 0.25) of the "mattes" channels of the deformable stage, as in MI[fixed,moving,weight,32,Random,0.25] of 'ANTs'; only the sampled voxels drive the field, which the update smoothing spreads. They are independent of number_of_bins and sampling_rate, which set the same quantities for the rigid and affine stages

syn_channel_combination

how the channels of the deformable stage are combined: "sum" (default) adds the weighted forces of the channels, so a channel whose derivative is larger (sharper edges, or mean squares on brighter images) counts more than its weight; "normalized" divides the force field of each channel by its norm before weighting, as the multi-metric of ITK that 'ANTs' uses, so only the weights set the share of each channel. Use "normalized" to combine "mattes" channels with others, as their derivative has another scale

syn_symmetric

whether the deformable stage is symmetric, as the SyN of 'ANTs': two displacement fields carry the target and the source to a middle space, each driven by the gradient of its own image, and every update is composed with the field (the maps stay one-to-one) instead of added to it; the result is the inverse of the target half composed with the source half; as in 'ANTs', the fields keep zero displacement on the outermost voxel layer, and only the voxels whose samples fall inside both images and both masks drive either half (a source sample outside source_mask is background, which pulls neither image). The default FALSE keeps the faster one-sided update, driven by the source gradient only, whose bias (for instance with "mattes") is not canceled by the other side. Not available with landmarks (source_points)

verbose

logical; if TRUE (default) print per-level and per-iteration progress to the console, including the current stage, shrink factor, smoothing sigma, cost metric, and step size (linear) or maximum displacement (deformable), with the convergence stop also the convergence value and why each deformable level ended; useful to monitor convergence on large volumes

Value

A list of class ravetools_register_volume3d with:

transform

the estimated 4x4 RAS-to-RAS linear transform mapping target (fixed) coordinates to source (moving) coordinates

image

the (primary) source resampled onto the target grid

images

a list with every source channel resampled onto the target grid using its own interpolation; image is the first element. For single-image input this is a length-1 list

forward_field,inverse_field

(only for "syn") the deformation fields on the target grid, see ‘Details’

metric_trace

the metric value across the optimizer iterations that ran (in the deformable stage, the weighted cost of all channels plus the landmark term, one value per iteration)

syn_iterations_run

(only for "syn" and "syn_only") the number of deformable iterations each level ran; 0 for levels without a positive iteration count

geometry

the source and target grids (source_dim, source_vox2ras, target_dim, target_vox2ras)

type,metric

echoes of the inputs

Details

Choosing a metric. For a same-contrast pair, such as a native 'T1'-weighted scan against a 'T1' template, the default metric = "mattes" reproduces the 'ANTs' SyN recipe: Mattes mutual information drives the rigid and affine stages and local cross-correlation drives the deformable stage (the "cc" metric only changes the linear stages). The 'ANTs'-like 'T1'-to-template preset is syn_cc_radius = 4, syn_grad_step = 0.15 and syn_sigma = 3.5; the defaults are a faster, lightly regularized variant. For cross-contrast pairs mutual information is the usual choice for the linear stages. In the deformable stage, the squared local correlation tolerates an inverted contrast (such as 'T2' against 'T1') but not a non-monotonic relation (such as FLAIR or 'CT' against 'T1'); for such channels, or for probability maps whose edges differ in sharpness, set syn_metric = "mattes" for them with syn_channel_combination = "normalized", as the MI channels of a multivariate 'ANTs' SyN.

Convergence of the deformable stage. With syn_convergence set (the default), every deformable level ends as soon as its cost stops decreasing, by the rule of 'ANTs': the cost of the first channel (without its weight and without the landmark term) is recorded at every iteration and divided by the sum of its absolute values since the level started; once syn_convergence_window values exist, a straight line is fitted through the most recent ones (the B-spline fit of ITK), and the level stops when the fitted decrease across the window falls below syn_convergence. A level therefore runs at least syn_convergence_window iterations (or all of them, if fewer), unless an update vanishes, after which the field cannot change anymore (only with syn_total_sigma = 0); the last update is kept. The window thus sets the minimum number of iterations of a level, and the threshold how flat the trend of the cost must be before the level stops: while the cost still decreases steadily, a level can run to its maximum. Every update has the same size (syn_grad_step times the voxel spacing), so once the deformation settles the cost tends to oscillate, and a level then usually ends a few iterations later. syn_iterations_run in the result gives the iterations each level ran. With syn_convergence = NULL, every iteration runs (the behavior before ravetools 0.4.1).

Deformation fields. forward_field is the displacement \(u_f\) on the target grid such that image samples the source at \(A(r + u_f(r))\). inverse_field is its numerical inverse on the same grid, computed by damped fixed-point iteration (Chen 2008, see ‘References’; at most 20 sweeps, as in 'ANTs'), so \(r + u_f(r) + u_i(r + u_f(r)) \approx r\) and vice versa to within a small fraction of a voxel wherever the forward map is one-to-one inside the target grid. Near the border of an unmasked registration the deformation can fold or push points out of the grid; there the inverse has no exact solution, so inverse_field values at the border are approximate (a target_mask keeps the deformation away from the border). Use apply_transform3d_volume and apply_transform3d_points to apply the result to other volumes or coordinates.

References

Avants B, Epstein C, Grossman M, Gee J (2008). Symmetric diffeomorphic image registration with cross-correlation: evaluating automated labeling of elderly and neurodegenerative brain. Medical Image Analysis, 12(1), 26-41.

Chen M, Lu W, Chen Q, Ruchala K, Olivera G (2008). A simple fixed-point approach to invert a deformation field. Medical Physics, 35(1), 81-88.

Examples

# \donttest{

# --- synthetic same-modality example -------------------------------------
nd <- c(50, 50, 50)
vox2ras <- diag(4); vox2ras[1:3, 4] <- -25
blob <- function(cx, cy, cz, s = 6) {
  g <- expand.grid(x = 0:(nd[1]-1), y = 0:(nd[2]-1), z = 0:(nd[3]-1))
  array(exp(-((g$x-cx)^2 + (g$y-cy)^2 + (g$z-cz)^2) / (2*s^2)), nd)
}
target <- blob(25, 25, 25)
source <- blob(28, 23, 26)            # shifted by a known (3, -2, 1) mm

res <- register_volume3d(
  source, target,
  source_vox2ras = vox2ras, target_vox2ras = vox2ras,
  type = "rigid", metric = "cc"
)
#> [rigid] level 1/3 (shrink=4, sigma=2.0): max 1000 iterations
#>   it     1  step = 4.000000: cost = -0.915936
#>   it     2  step = 2.000000: cost = -0.979488
#>   it     3  step = 2.000000: cost = -0.999069
#>   it     4  step = 1.000000: cost = -0.996996
#>   it     5  step = 0.500000: cost = -0.999831
#>   it     6  step = 0.500000: cost = -0.999220
#>   it     7  step = 0.250000: cost = -0.999940
#>   it     8  step = 0.250000: cost = -0.999846
#>   it     9  step = 0.125000: cost = -0.999994
#>   it    10  step = 0.125000: cost = -0.999943
#>   it    11  step = 0.062500: cost = -0.999993
#>   it    12  step = 0.062500: cost = -0.999994
#>   it    13  step = 0.031250: cost = -1.000000
#>   it    14  step = 0.015625: cost = -0.999999
#>   it    15  step = 0.007812: cost = -1.000000
#>   it    16  step = 0.007812: cost = -1.000000
#>   => converged (step < minStep)  best cost=-1.000000
#> [rigid] level 2/3 (shrink=2, sigma=1.0): max 500 iterations
#>   it     1  step = 2.000000: cost = -0.966638
#>   it     2  step = 1.000000: cost = -0.991557
#>   it     3  step = 1.000000: cost = -0.999982
#>   it     4  step = 0.500000: cost = -0.998462
#>   it     5  step = 0.250000: cost = -0.999695
#>   it     6  step = 0.250000: cost = -0.999981
#>   it     7  step = 0.125000: cost = -0.999955
#>   it     8  step = 0.062500: cost = -0.999998
#>   it     9  step = 0.062500: cost = -0.999982
#>   it    10  step = 0.031250: cost = -0.999998
#>   it    11  step = 0.031250: cost = -0.999998
#>   it    12  step = 0.015625: cost = -1.000000
#>   it    13  step = 0.007812: cost = -1.000000
#>   it    14  step = 0.003906: cost = -1.000000
#>   it    15  step = 0.003906: cost = -1.000000
#>   => converged (step < minStep)  best cost=-1.000000
#> [rigid] level 3/3 (shrink=1, sigma=0.0): max 250 iterations
#>   it     1  step = 1.000000: cost = -0.992627
#>   it     2  step = 0.500000: cost = -0.998147
#>   it     3  step = 0.500000: cost = -1.000000
#>   it     4  step = 0.250000: cost = -0.999536
#>   it     5  step = 0.125000: cost = -0.999890
#>   it     6  step = 0.125000: cost = -1.000000
#>   it     7  step = 0.062500: cost = -0.999975
#>   it     8  step = 0.031250: cost = -0.999995
#>   it     9  step = 0.031250: cost = -1.000000
#>   it    10  step = 0.015625: cost = -0.999999
#>   it    11  step = 0.007812: cost = -1.000000
#>   it    12  step = 0.007812: cost = -1.000000
#>   it    13  step = 0.003906: cost = -1.000000
#>   it    14  step = 0.003906: cost = -1.000000
#>   it    15  step = 0.001953: cost = -1.000000
#>   => converged (step < minStep)  best cost=-1.000000
res$transform[1:3, 4]                 # ~ c(3, -2, 1)
#> [1]  3.0000832 -2.0002276  0.9998873


# --- multimodal registration (several co-registered channels) ------------
# Two aligned modalities (e.g. a T1 and a T2) jointly drive the deformable
# stage; the rigid and affine stages use the first pair only. `metric` sets
# the metric of the rigid and affine stages, `syn_metric` the deformable
# metric of each pair, and `weights` their relative influence (normalized
# internally to sum to 1). All source channels must share a grid; likewise
# all target channels.
t1_target <- blob(25, 25, 25, s = 6)
t2_target <- blob(25, 25, 25, s = 9)  # same anatomy, different contrast
t1_source <- blob(27, 24, 26, s = 6)  # both channels share the same warp
t2_source <- blob(27, 24, 26, s = 9)

res_mm <- register_volume3d(
  source = list(t1_source, t2_source),
  target = list(t1_target, t2_target),
  source_vox2ras = vox2ras, target_vox2ras = vox2ras,
  weights = c(2, 1),                  # T1 counts twice as much as T2
  metric = "mattes",                  # rigid and affine stages (first pair)
  syn_metric = c("cc", "mattes"),     # deformable metric of each pair
  syn_channel_combination = "normalized",  # so the weights alone set the shares
  type = "syn"
)
#> [rigid] level 1/3 (shrink=4, sigma=2.0): max 1000 iterations
#>   it     1  step = 4.000000: cost = -0.473960
#>   it     2  step = 2.000000: cost = -0.529658
#>   it     3  step = 2.000000: cost = -0.589115
#>   it     4  step = 2.000000: cost = -0.559668
#>   it     5  step = 1.000000: cost = -0.564823
#>   it     6  step = 1.000000: cost = -0.587755
#>   it     7  step = 0.500000: cost = -0.584957
#>   it     8  step = 0.250000: cost = -0.590449
#>   it     9  step = 0.250000: cost = -0.587515
#>   it    10  step = 0.125000: cost = -0.590149
#>   it    11  step = 0.125000: cost = -0.590498
#>   it    12  step = 0.062500: cost = -0.590606
#>   it    13  step = 0.031250: cost = -0.590649
#>   it    14  step = 0.015625: cost = -0.590657
#>   it    15  step = 0.007812: cost = -0.590661
#>   => converged (step < minStep)  best cost=-0.590661
#> [rigid] level 2/3 (shrink=2, sigma=1.0): max 500 iterations
#>   it     1  step = 2.000000: cost = -0.441226
#>   it     2  step = 1.000000: cost = -0.508360
#>   it     3  step = 1.000000: cost = -0.570802
#>   it     4  step = 0.500000: cost = -0.555848
#>   it     5  step = 0.250000: cost = -0.570353
#>   it     6  step = 0.250000: cost = -0.570802
#>   it     7  step = 0.125000: cost = -0.572873
#>   it     8  step = 0.062500: cost = -0.572469
#>   it     9  step = 0.031250: cost = -0.572822
#>   it    10  step = 0.031250: cost = -0.572873
#>   it    11  step = 0.015625: cost = -0.572886
#>   it    12  step = 0.007812: cost = -0.572889
#>   it    13  step = 0.003906: cost = -0.572890
#>   => converged (step < minStep)  best cost=-0.572890
#> [rigid] level 3/3 (shrink=1, sigma=0.0): max 250 iterations
#>   it     1  step = 1.000000: cost = -0.470544
#>   it     2  step = 0.500000: cost = -0.508023
#>   it     3  step = 0.500000: cost = -0.538966
#>   it     4  step = 0.250000: cost = -0.523130
#>   it     5  step = 0.125000: cost = -0.529009
#>   it     6  step = 0.125000: cost = -0.538154
#>   it     7  step = 0.062500: cost = -0.539603
#>   it     8  step = 0.031250: cost = -0.540068
#>   it     9  step = 0.031250: cost = -0.537787
#>   it    10  step = 0.015625: cost = -0.539982
#>   it    11  step = 0.015625: cost = -0.535920
#>   it    12  step = 0.007812: cost = -0.537438
#>   it    13  step = 0.007812: cost = -0.540149
#>   it    14  step = 0.003906: cost = -0.538544
#>   it    15  step = 0.001953: cost = -0.539447
#>   => converged (step < minStep)  best cost=-0.540149
#> [affine] level 1/3 (shrink=4, sigma=2.0): max 1000 iterations
#>   it     1  step = 4.000000: cost = -0.496476
#>   it     2  step = 2.000000: cost = -0.539590
#>   it     3  step = 2.000000: cost = -0.522749
#>   it     4  step = 1.000000: cost = -0.569244
#>   it     5  step = 1.000000: cost = -0.558248
#>   it     6  step = 0.500000: cost = -0.577268
#>   it     7  step = 0.500000: cost = -0.575533
#>   it     8  step = 0.250000: cost = -0.583549
#>   it     9  step = 0.250000: cost = -0.583164
#>   it    10  step = 0.125000: cost = -0.585193
#>   it    11  step = 0.125000: cost = -0.585787
#>   it    12  step = 0.125000: cost = -0.586112
#>   it    13  step = 0.062500: cost = -0.586543
#>   it    14  step = 0.062500: cost = -0.586806
#>   it    15  step = 0.062500: cost = -0.586986
#>   it    16  step = 0.031250: cost = -0.587155
#>   it    17  step = 0.031250: cost = -0.587299
#>   it    18  step = 0.031250: cost = -0.587438
#>   it    19  step = 0.031250: cost = -0.587574
#>   it    20  step = 0.031250: cost = -0.587707
#>   it    21  step = 0.031250: cost = -0.587837
#>   it    22  step = 0.031250: cost = -0.587965
#>   it    23  step = 0.031250: cost = -0.588092
#>   it    24  step = 0.031250: cost = -0.588219
#>   it    25  step = 0.031250: cost = -0.588346
#>   it    26  step = 0.031250: cost = -0.588474
#>   it    27  step = 0.031250: cost = -0.588605
#>   it    28  step = 0.031250: cost = -0.588739
#>   it    29  step = 0.031250: cost = -0.588878
#>   it    30  step = 0.031250: cost = -0.589022
#>   it    31  step = 0.031250: cost = -0.589170
#>   it    32  step = 0.031250: cost = -0.589324
#>   it    33  step = 0.031250: cost = -0.589482
#>   it    34  step = 0.031250: cost = -0.589644
#>   it    35  step = 0.031250: cost = -0.589809
#>   it    36  step = 0.031250: cost = -0.589974
#>   it    37  step = 0.031250: cost = -0.590143
#>   it    38  step = 0.031250: cost = -0.590313
#>   it    39  step = 0.031250: cost = -0.590483
#>   it    40  step = 0.031250: cost = -0.590650
#>   it    41  step = 0.031250: cost = -0.590823
#>   it    42  step = 0.031250: cost = -0.590993
#>   it    43  step = 0.031250: cost = -0.591163
#>   it    44  step = 0.031250: cost = -0.591332
#>   it    45  step = 0.031250: cost = -0.591497
#>   it    46  step = 0.031250: cost = -0.591655
#>   it    47  step = 0.031250: cost = -0.591814
#>   it    48  step = 0.031250: cost = -0.591967
#>   it    49  step = 0.031250: cost = -0.592111
#>   it    50  step = 0.031250: cost = -0.592243
#>   it    51  step = 0.031250: cost = -0.592364
#>   it    52  step = 0.031250: cost = -0.592465
#>   it    53  step = 0.031250: cost = -0.592550
#>   it    54  step = 0.031250: cost = -0.592621
#>   it    55  step = 0.031250: cost = -0.592677
#>   it    56  step = 0.015625: cost = -0.592727
#>   it    57  step = 0.015625: cost = -0.592767
#>   it    58  step = 0.015625: cost = -0.592805
#>   it    59  step = 0.015625: cost = -0.592833
#>   it    60  step = 0.015625: cost = -0.592856
#>   it    61  step = 0.015625: cost = -0.592873
#>   it    62  step = 0.015625: cost = -0.592884
#>   it    63  step = 0.007812: cost = -0.592897
#>   it    64  step = 0.007812: cost = -0.592907
#>   it    65  step = 0.007812: cost = -0.592917
#>   it    66  step = 0.007812: cost = -0.592927
#>   it    67  step = 0.007812: cost = -0.592937
#>   it    68  step = 0.007812: cost = -0.592946
#>   it    69  step = 0.007812: cost = -0.592954
#>   it    70  step = 0.007812: cost = -0.592963
#>   it    71  step = 0.007812: cost = -0.592971
#>   it    72  step = 0.007812: cost = -0.592979
#>   it    73  step = 0.007812: cost = -0.592987
#>   it    74  step = 0.007812: cost = -0.592995
#>   it    75  step = 0.007812: cost = -0.593003
#>   it    76  step = 0.007812: cost = -0.593011
#>   it    77  step = 0.007812: cost = -0.593019
#>   it    78  step = 0.007812: cost = -0.593027
#>   it    79  step = 0.007812: cost = -0.593034
#>   it    80  step = 0.007812: cost = -0.593041
#>   it    81  step = 0.007812: cost = -0.593049
#>   it    82  step = 0.007812: cost = -0.593057
#>   it    83  step = 0.007812: cost = -0.593066
#>   it    84  step = 0.007812: cost = -0.593075
#>   it    85  step = 0.007812: cost = -0.593085
#>   it    86  step = 0.007812: cost = -0.593096
#>   it    87  step = 0.007812: cost = -0.593107
#>   it    88  step = 0.007812: cost = -0.593118
#>   it    89  step = 0.007812: cost = -0.593129
#>   it    90  step = 0.007812: cost = -0.593141
#>   it    91  step = 0.007812: cost = -0.593153
#>   it    92  step = 0.007812: cost = -0.593166
#>   it    93  step = 0.007812: cost = -0.593183
#>   it    94  step = 0.007812: cost = -0.593202
#>   it    95  step = 0.007812: cost = -0.593220
#>   it    96  step = 0.007812: cost = -0.593239
#>   it    97  step = 0.007812: cost = -0.593258
#>   it    98  step = 0.007812: cost = -0.593277
#>   it    99  step = 0.007812: cost = -0.593296
#>   it   100  step = 0.007812: cost = -0.593316
#>   it   101  step = 0.007812: cost = -0.593337
#>   it   102  step = 0.007812: cost = -0.593358
#>   it   103  step = 0.007812: cost = -0.593379
#>   it   104  step = 0.007812: cost = -0.593401
#>   it   105  step = 0.007812: cost = -0.593423
#>   it   106  step = 0.007812: cost = -0.593446
#>   it   107  step = 0.007812: cost = -0.593469
#>   it   108  step = 0.007812: cost = -0.593493
#>   it   109  step = 0.007812: cost = -0.593517
#>   it   110  step = 0.007812: cost = -0.593541
#>   it   111  step = 0.007812: cost = -0.593566
#>   it   112  step = 0.007812: cost = -0.593591
#>   it   113  step = 0.007812: cost = -0.593616
#>   it   114  step = 0.007812: cost = -0.593642
#>   it   115  step = 0.007812: cost = -0.593668
#>   it   116  step = 0.007812: cost = -0.593694
#>   it   117  step = 0.007812: cost = -0.593721
#>   it   118  step = 0.007812: cost = -0.593748
#>   it   119  step = 0.007812: cost = -0.593775
#>   it   120  step = 0.007812: cost = -0.593802
#>   it   121  step = 0.007812: cost = -0.593829
#>   it   122  step = 0.007812: cost = -0.593857
#>   it   123  step = 0.007812: cost = -0.593884
#>   it   124  step = 0.007812: cost = -0.593912
#>   it   125  step = 0.007812: cost = -0.593939
#>   it   126  step = 0.007812: cost = -0.593967
#>   it   127  step = 0.007812: cost = -0.593994
#>   it   128  step = 0.007812: cost = -0.594022
#>   it   129  step = 0.007812: cost = -0.594049
#>   it   130  step = 0.007812: cost = -0.594076
#>   it   131  step = 0.007812: cost = -0.594103
#>   it   132  step = 0.007812: cost = -0.594130
#>   it   133  step = 0.007812: cost = -0.594157
#>   it   134  step = 0.007812: cost = -0.594184
#>   it   135  step = 0.007812: cost = -0.594210
#>   it   136  step = 0.007812: cost = -0.594237
#>   it   137  step = 0.007812: cost = -0.594263
#>   it   138  step = 0.007812: cost = -0.594289
#>   it   139  step = 0.007812: cost = -0.594314
#>   it   140  step = 0.007812: cost = -0.594340
#>   it   141  step = 0.007812: cost = -0.594365
#>   it   142  step = 0.007812: cost = -0.594390
#>   it   143  step = 0.007812: cost = -0.594414
#>   it   144  step = 0.007812: cost = -0.594438
#>   it   145  step = 0.007812: cost = -0.594462
#>   it   146  step = 0.007812: cost = -0.594486
#>   it   147  step = 0.007812: cost = -0.594509
#>   it   148  step = 0.007812: cost = -0.594531
#>   it   149  step = 0.007812: cost = -0.594554
#>   it   150  step = 0.007812: cost = -0.594576
#>   it   151  step = 0.007812: cost = -0.594597
#>   it   152  step = 0.007812: cost = -0.594618
#>   it   153  step = 0.007812: cost = -0.594639
#>   it   154  step = 0.007812: cost = -0.594659
#>   it   155  step = 0.007812: cost = -0.594679
#>   it   156  step = 0.007812: cost = -0.594698
#>   it   157  step = 0.007812: cost = -0.594717
#>   it   158  step = 0.007812: cost = -0.594735
#>   it   159  step = 0.007812: cost = -0.594753
#>   it   160  step = 0.007812: cost = -0.594771
#>   it   161  step = 0.007812: cost = -0.594788
#>   it   162  step = 0.007812: cost = -0.594804
#>   it   163  step = 0.007812: cost = -0.594820
#>   it   164  step = 0.007812: cost = -0.594836
#>   it   165  step = 0.007812: cost = -0.594851
#>   it   166  step = 0.007812: cost = -0.594866
#>   it   167  step = 0.007812: cost = -0.594880
#>   it   168  step = 0.007812: cost = -0.594893
#>   it   169  step = 0.007812: cost = -0.594907
#>   it   170  step = 0.007812: cost = -0.594920
#>   it   171  step = 0.007812: cost = -0.594932
#>   it   172  step = 0.007812: cost = -0.594944
#>   it   173  step = 0.007812: cost = -0.594956
#>   it   174  step = 0.007812: cost = -0.594967
#>   it   175  step = 0.007812: cost = -0.594978
#>   it   176  step = 0.007812: cost = -0.594989
#>   it   177  step = 0.007812: cost = -0.594999
#>   it   178  step = 0.007812: cost = -0.595008
#>   it   179  step = 0.007812: cost = -0.595018
#>   it   180  step = 0.007812: cost = -0.595027
#>   it   181  step = 0.007812: cost = -0.595035
#>   it   182  step = 0.007812: cost = -0.595044
#>   it   183  step = 0.007812: cost = -0.595052
#>   it   184  step = 0.007812: cost = -0.595060
#>   it   185  step = 0.007812: cost = -0.595067
#>   it   186  step = 0.007812: cost = -0.595075
#>   it   187  step = 0.007812: cost = -0.595082
#>   it   188  step = 0.007812: cost = -0.595089
#>   it   189  step = 0.007812: cost = -0.595096
#>   it   190  step = 0.007812: cost = -0.595103
#>   it   191  step = 0.007812: cost = -0.595109
#>   it   192  step = 0.007812: cost = -0.595116
#>   it   193  step = 0.007812: cost = -0.595122
#>   it   194  step = 0.007812: cost = -0.595128
#>   it   195  step = 0.007812: cost = -0.595134
#>   it   196  step = 0.007812: cost = -0.595140
#>   it   197  step = 0.007812: cost = -0.595144
#>   it   198  step = 0.007812: cost = -0.595148
#>   => converged (step < minStep)  best cost=-0.595148
#> [affine] level 2/3 (shrink=2, sigma=1.0): max 500 iterations
#>   it     1  step = 2.000000: cost = -0.436550
#>   it     2  step = 1.000000: cost = -0.520698
#>   it     3  step = 1.000000: cost = -0.582069
#>   it     4  step = 0.500000: cost = -0.582235
#>   it     5  step = 0.250000: cost = -0.595145
#>   it     6  step = 0.250000: cost = -0.593523
#>   it     7  step = 0.125000: cost = -0.595179
#>   it     8  step = 0.062500: cost = -0.595617
#>   it     9  step = 0.031250: cost = -0.595766
#>   it    10  step = 0.015625: cost = -0.595816
#>   it    11  step = 0.015625: cost = -0.595842
#>   it    12  step = 0.015625: cost = -0.595843
#>   it    13  step = 0.007812: cost = -0.595863
#>   it    14  step = 0.007812: cost = -0.595872
#>   it    15  step = 0.007812: cost = -0.595879
#>   it    16  step = 0.007812: cost = -0.595884
#>   it    17  step = 0.003906: cost = -0.595890
#>   it    18  step = 0.003906: cost = -0.595895
#>   it    19  step = 0.003906: cost = -0.595899
#>   it    20  step = 0.003906: cost = -0.595904
#>   it    21  step = 0.003906: cost = -0.595909
#>   it    22  step = 0.003906: cost = -0.595914
#>   it    23  step = 0.003906: cost = -0.595919
#>   it    24  step = 0.003906: cost = -0.595924
#>   it    25  step = 0.003906: cost = -0.595929
#>   it    26  step = 0.003906: cost = -0.595934
#>   it    27  step = 0.003906: cost = -0.595940
#>   it    28  step = 0.003906: cost = -0.595945
#>   it    29  step = 0.003906: cost = -0.595951
#>   it    30  step = 0.003906: cost = -0.595957
#>   it    31  step = 0.003906: cost = -0.595962
#>   it    32  step = 0.003906: cost = -0.595968
#>   it    33  step = 0.003906: cost = -0.595973
#>   it    34  step = 0.003906: cost = -0.595978
#>   it    35  step = 0.003906: cost = -0.595984
#>   it    36  step = 0.003906: cost = -0.595989
#>   it    37  step = 0.003906: cost = -0.595995
#>   it    38  step = 0.003906: cost = -0.596000
#>   it    39  step = 0.003906: cost = -0.596005
#>   it    40  step = 0.003906: cost = -0.596010
#>   it    41  step = 0.003906: cost = -0.596016
#>   it    42  step = 0.003906: cost = -0.596021
#>   it    43  step = 0.003906: cost = -0.596026
#>   it    44  step = 0.003906: cost = -0.596031
#>   it    45  step = 0.003906: cost = -0.596036
#>   it    46  step = 0.003906: cost = -0.596041
#>   it    47  step = 0.003906: cost = -0.596046
#>   it    48  step = 0.003906: cost = -0.596051
#>   it    49  step = 0.003906: cost = -0.596056
#>   it    50  step = 0.003906: cost = -0.596061
#>   it    51  step = 0.003906: cost = -0.596066
#>   it    52  step = 0.003906: cost = -0.596071
#>   it    53  step = 0.003906: cost = -0.596076
#>   it    54  step = 0.003906: cost = -0.596080
#>   it    55  step = 0.003906: cost = -0.596085
#>   it    56  step = 0.003906: cost = -0.596090
#>   it    57  step = 0.003906: cost = -0.596095
#>   it    58  step = 0.003906: cost = -0.596099
#>   it    59  step = 0.003906: cost = -0.596104
#>   it    60  step = 0.003906: cost = -0.596108
#>   it    61  step = 0.003906: cost = -0.596113
#>   it    62  step = 0.003906: cost = -0.596117
#>   it    63  step = 0.003906: cost = -0.596122
#>   it    64  step = 0.003906: cost = -0.596126
#>   it    65  step = 0.003906: cost = -0.596131
#>   it    66  step = 0.003906: cost = -0.596135
#>   it    67  step = 0.003906: cost = -0.596140
#>   it    68  step = 0.003906: cost = -0.596144
#>   it    69  step = 0.003906: cost = -0.596149
#>   it    70  step = 0.003906: cost = -0.596153
#>   it    71  step = 0.003906: cost = -0.596157
#>   it    72  step = 0.003906: cost = -0.596162
#>   it    73  step = 0.003906: cost = -0.596166
#>   it    74  step = 0.003906: cost = -0.596171
#>   it    75  step = 0.003906: cost = -0.596175
#>   it    76  step = 0.003906: cost = -0.596179
#>   it    77  step = 0.003906: cost = -0.596184
#>   it    78  step = 0.003906: cost = -0.596188
#>   it    79  step = 0.003906: cost = -0.596192
#>   it    80  step = 0.003906: cost = -0.596196
#>   it    81  step = 0.003906: cost = -0.596201
#>   it    82  step = 0.003906: cost = -0.596205
#>   it    83  step = 0.003906: cost = -0.596209
#>   it    84  step = 0.003906: cost = -0.596213
#>   it    85  step = 0.003906: cost = -0.596217
#>   it    86  step = 0.003906: cost = -0.596221
#>   it    87  step = 0.003906: cost = -0.596226
#>   it    88  step = 0.003906: cost = -0.596230
#>   it    89  step = 0.003906: cost = -0.596234
#>   it    90  step = 0.003906: cost = -0.596238
#>   it    91  step = 0.003906: cost = -0.596242
#>   it    92  step = 0.003906: cost = -0.596245
#>   it    93  step = 0.003906: cost = -0.596249
#>   it    94  step = 0.003906: cost = -0.596253
#>   it    95  step = 0.003906: cost = -0.596257
#>   it    96  step = 0.003906: cost = -0.596261
#>   it    97  step = 0.003906: cost = -0.596264
#>   it    98  step = 0.003906: cost = -0.596268
#>   it    99  step = 0.003906: cost = -0.596271
#>   it   100  step = 0.003906: cost = -0.596275
#>   it   101  step = 0.003906: cost = -0.596278
#>   it   102  step = 0.003906: cost = -0.596281
#>   it   103  step = 0.003906: cost = -0.596285
#>   it   104  step = 0.003906: cost = -0.596288
#>   it   105  step = 0.003906: cost = -0.596291
#>   it   106  step = 0.003906: cost = -0.596294
#>   it   107  step = 0.003906: cost = -0.596296
#>   it   108  step = 0.003906: cost = -0.596299
#>   it   109  step = 0.003906: cost = -0.596301
#>   => converged (step < minStep)  best cost=-0.596301
#> [affine] level 3/3 (shrink=1, sigma=0.0): max 250 iterations
#>   it     1  step = 1.000000: cost = -0.524449
#>   it     2  step = 0.500000: cost = -0.548692
#>   it     3  step = 0.250000: cost = -0.559561
#>   it     4  step = 0.250000: cost = -0.565430
#>   it     5  step = 0.250000: cost = -0.562228
#>   it     6  step = 0.125000: cost = -0.567481
#>   it     7  step = 0.125000: cost = -0.565607
#>   it     8  step = 0.062500: cost = -0.567467
#>   it     9  step = 0.062500: cost = -0.567487
#>   it    10  step = 0.031250: cost = -0.567719
#>   it    11  step = 0.015625: cost = -0.567724
#>   it    12  step = 0.007812: cost = -0.567732
#>   it    13  step = 0.003906: cost = -0.567735
#>   it    14  step = 0.003906: cost = -0.567737
#>   it    15  step = 0.003906: cost = -0.567740
#>   it    16  step = 0.003906: cost = -0.567743
#>   it    17  step = 0.003906: cost = -0.567746
#>   it    18  step = 0.003906: cost = -0.567749
#>   it    19  step = 0.003906: cost = -0.567752
#>   it    20  step = 0.003906: cost = -0.567754
#>   it    21  step = 0.003906: cost = -0.567757
#>   it    22  step = 0.003906: cost = -0.567760
#>   it    23  step = 0.003906: cost = -0.567763
#>   it    24  step = 0.003906: cost = -0.567765
#>   it    25  step = 0.003906: cost = -0.567768
#>   it    26  step = 0.003906: cost = -0.567771
#>   it    27  step = 0.003906: cost = -0.567773
#>   it    28  step = 0.003906: cost = -0.567776
#>   it    29  step = 0.003906: cost = -0.567779
#>   it    30  step = 0.003906: cost = -0.567781
#>   it    31  step = 0.003906: cost = -0.567784
#>   it    32  step = 0.003906: cost = -0.567786
#>   it    33  step = 0.003906: cost = -0.567789
#>   it    34  step = 0.003906: cost = -0.567791
#>   it    35  step = 0.003906: cost = -0.567794
#>   it    36  step = 0.003906: cost = -0.567796
#>   it    37  step = 0.003906: cost = -0.567798
#>   it    38  step = 0.003906: cost = -0.567801
#>   it    39  step = 0.003906: cost = -0.567803
#>   it    40  step = 0.003906: cost = -0.567805
#>   it    41  step = 0.003906: cost = -0.567808
#>   it    42  step = 0.003906: cost = -0.567810
#>   it    43  step = 0.003906: cost = -0.567812
#>   it    44  step = 0.003906: cost = -0.567815
#>   it    45  step = 0.003906: cost = -0.567817
#>   it    46  step = 0.003906: cost = -0.567819
#>   it    47  step = 0.003906: cost = -0.567822
#>   it    48  step = 0.003906: cost = -0.567824
#>   it    49  step = 0.003906: cost = -0.567826
#>   it    50  step = 0.003906: cost = -0.567828
#>   it    51  step = 0.003906: cost = -0.567830
#>   it    52  step = 0.003906: cost = -0.567833
#>   it    53  step = 0.003906: cost = -0.567835
#>   it    54  step = 0.003906: cost = -0.567837
#>   it    55  step = 0.003906: cost = -0.567839
#>   it    56  step = 0.003906: cost = -0.567841
#>   it    57  step = 0.003906: cost = -0.567843
#>   it    58  step = 0.003906: cost = -0.567845
#>   it    59  step = 0.001953: cost = -0.567846
#>   it    60  step = 0.001953: cost = -0.567848
#>   it    61  step = 0.001953: cost = -0.567849
#>   it    62  step = 0.001953: cost = -0.567850
#>   it    63  step = 0.001953: cost = -0.567852
#>   it    64  step = 0.001953: cost = -0.567853
#>   it    65  step = 0.001953: cost = -0.567854
#>   it    66  step = 0.001953: cost = -0.567856
#>   it    67  step = 0.001953: cost = -0.567857
#>   it    68  step = 0.001953: cost = -0.567858
#>   it    69  step = 0.001953: cost = -0.567860
#>   it    70  step = 0.001953: cost = -0.567861
#>   it    71  step = 0.001953: cost = -0.567862
#>   it    72  step = 0.001953: cost = -0.567864
#>   it    73  step = 0.001953: cost = -0.567865
#>   it    74  step = 0.001953: cost = -0.567866
#>   it    75  step = 0.001953: cost = -0.567867
#>   it    76  step = 0.001953: cost = -0.567869
#>   it    77  step = 0.001953: cost = -0.567870
#>   it    78  step = 0.001953: cost = -0.567871
#>   it    79  step = 0.001953: cost = -0.567872
#>   it    80  step = 0.001953: cost = -0.567873
#>   it    81  step = 0.001953: cost = -0.567874
#>   it    82  step = 0.001953: cost = -0.567876
#>   it    83  step = 0.001953: cost = -0.567877
#>   it    84  step = 0.001953: cost = -0.567878
#>   it    85  step = 0.001953: cost = -0.567879
#>   it    86  step = 0.001953: cost = -0.567880
#>   it    87  step = 0.001953: cost = -0.567881
#>   it    88  step = 0.001953: cost = -0.567882
#>   it    89  step = 0.001953: cost = -0.567883
#>   it    90  step = 0.001953: cost = -0.567884
#>   it    91  step = 0.001953: cost = -0.567885
#>   it    92  step = 0.001953: cost = -0.567886
#>   it    93  step = 0.001953: cost = -0.567887
#>   it    94  step = 0.001953: cost = -0.567888
#>   it    95  step = 0.001953: cost = -0.567889
#>   it    96  step = 0.001953: cost = -0.567890
#>   it    97  step = 0.001953: cost = -0.567891
#>   it    98  step = 0.001953: cost = -0.567892
#>   it    99  step = 0.001953: cost = -0.567893
#>   it   100  step = 0.001953: cost = -0.567894
#>   it   101  step = 0.001953: cost = -0.567895
#>   it   102  step = 0.001953: cost = -0.567896
#>   it   103  step = 0.001953: cost = -0.567897
#>   it   104  step = 0.001953: cost = -0.567898
#>   it   105  step = 0.001953: cost = -0.567898
#>   it   106  step = 0.001953: cost = -0.567899
#>   it   107  step = 0.001953: cost = -0.567900
#>   it   108  step = 0.001953: cost = -0.567901
#>   it   109  step = 0.001953: cost = -0.567902
#>   it   110  step = 0.001953: cost = -0.567903
#>   it   111  step = 0.001953: cost = -0.567904
#>   it   112  step = 0.001953: cost = -0.567905
#>   it   113  step = 0.001953: cost = -0.567906
#>   it   114  step = 0.001953: cost = -0.567906
#>   it   115  step = 0.001953: cost = -0.567907
#>   it   116  step = 0.001953: cost = -0.567908
#>   it   117  step = 0.001953: cost = -0.567909
#>   it   118  step = 0.001953: cost = -0.567909
#>   it   119  step = 0.001953: cost = -0.567910
#>   it   120  step = 0.001953: cost = -0.567911
#>   it   121  step = 0.001953: cost = -0.567911
#>   it   122  step = 0.001953: cost = -0.567912
#>   it   123  step = 0.001953: cost = -0.567913
#>   it   124  step = 0.001953: cost = -0.567914
#>   it   125  step = 0.001953: cost = -0.567914
#>   it   126  step = 0.001953: cost = -0.567915
#>   it   127  step = 0.001953: cost = -0.567916
#>   it   128  step = 0.001953: cost = -0.567916
#>   it   129  step = 0.001953: cost = -0.567917
#>   it   130  step = 0.001953: cost = -0.567918
#>   it   131  step = 0.001953: cost = -0.567918
#>   it   132  step = 0.001953: cost = -0.567919
#>   it   133  step = 0.001953: cost = -0.567919
#>   it   134  step = 0.001953: cost = -0.567920
#>   it   135  step = 0.001953: cost = -0.567921
#>   it   136  step = 0.001953: cost = -0.567921
#>   it   137  step = 0.001953: cost = -0.567922
#>   it   138  step = 0.001953: cost = -0.567922
#>   it   139  step = 0.001953: cost = -0.567923
#>   it   140  step = 0.001953: cost = -0.567923
#>   it   141  step = 0.001953: cost = -0.567924
#>   it   142  step = 0.001953: cost = -0.567925
#>   it   143  step = 0.001953: cost = -0.567925
#>   it   144  step = 0.001953: cost = -0.567926
#>   it   145  step = 0.001953: cost = -0.567926
#>   it   146  step = 0.001953: cost = -0.567927
#>   it   147  step = 0.001953: cost = -0.567927
#>   it   148  step = 0.001953: cost = -0.567928
#>   it   149  step = 0.001953: cost = -0.567928
#>   it   150  step = 0.001953: cost = -0.567929
#>   => converged (step < minStep)  best cost=-0.567929
#> [SyN] level 1/3 (shrink=4, sigma=2.0, flow=3.0, channels=2): max 40 iterations
#>   it     1: cost = -1.030372  field_max = 0.80 mm
#>   it     2: cost = -1.034843  field_max = 1.57 mm
#>   it     3: cost = -1.036568  field_max = 2.35 mm
#>   it     4: cost = -1.036627  field_max = 3.13 mm
#>   it     5: cost = -1.033220  field_max = 3.92 mm
#>   it     6: cost = -1.027368  field_max = 4.68 mm
#>   it     7: cost = -1.018235  field_max = 5.47 mm
#>   it     8: cost = -1.006129  field_max = 6.24 mm
#>   it     9: cost = -0.992098  field_max = 6.86 mm
#>   it    10: cost = -0.980977  field_max = 7.15 mm  convergence = 4.042e-03
#>   it    11: cost = -0.975090  field_max = 7.34 mm  convergence = 2.896e-03
#>   it    12: cost = -0.971668  field_max = 7.44 mm  convergence = 2.092e-03
#>   it    13: cost = -0.970015  field_max = 7.48 mm  convergence = 1.547e-03
#>   it    14: cost = -0.968913  field_max = 7.52 mm  convergence = 1.231e-03
#>   it    15: cost = -0.968451  field_max = 7.49 mm  convergence = 1.048e-03
#>   it    16: cost = -0.968144  field_max = 8.14 mm  convergence = 9.574e-04
#>   it    17: cost = -0.968056  field_max = 8.80 mm  convergence = 8.918e-04
#>   it    18: cost = -0.968023  field_max = 9.40 mm  convergence = 8.312e-04
#>   it    19: cost = -0.968032  field_max = 9.91 mm  convergence = 7.517e-04
#>   it    20: cost = -0.968013  field_max = 10.35 mm  convergence = 6.739e-04
#>   it    21: cost = -0.968046  field_max = 11.02 mm  convergence = 6.037e-04
#>   it    22: cost = -0.968042  field_max = 11.59 mm  convergence = 5.443e-04
#>   it    23: cost = -0.968140  field_max = 12.00 mm  convergence = 4.961e-04
#>   it    24: cost = -0.967964  field_max = 12.36 mm  convergence = 4.555e-04
#>   it    25: cost = -0.967614  field_max = 12.57 mm  convergence = 4.185e-04
#>   it    26: cost = -0.966332  field_max = 12.74 mm  convergence = 3.777e-04
#>   it    27: cost = -0.966252  field_max = 12.82 mm  convergence = 3.300e-04
#>   it    28: cost = -0.967190  field_max = 13.04 mm  convergence = 2.837e-04
#>   it    29: cost = -0.965899  field_max = 13.10 mm  convergence = 2.305e-04
#>   it    30: cost = -0.966601  field_max = 13.27 mm  convergence = 1.855e-04
#>   it    31: cost = -0.966061  field_max = 13.34 mm  convergence = 1.413e-04
#>   it    32: cost = -0.965841  field_max = 13.47 mm  convergence = 1.070e-04
#>   it    33: cost = -0.965628  field_max = 13.53 mm  convergence = 7.937e-05
#>   it    34: cost = -0.965258  field_max = 13.65 mm  convergence = 6.196e-05
#>   it    35: cost = -0.965096  field_max = 13.71 mm  convergence = 4.934e-05
#>   it    36: cost = -0.964454  field_max = 13.81 mm  convergence = 4.028e-05
#>   it    37: cost = -0.964576  field_max = 13.88 mm  convergence = 2.893e-05
#>   it    38: cost = -0.963737  field_max = 13.97 mm  convergence = 2.367e-05
#>   it    39: cost = -0.963860  field_max = 14.04 mm  convergence = 1.399e-05
#>   it    40: cost = -0.963157  field_max = 14.14 mm  convergence = 1.237e-05
#>   => max iterations reached (40)  cost=-0.963157
#> [SyN] level 2/3 (shrink=2, sigma=1.0, flow=3.0, channels=2): max 20 iterations
#>   it     1: cost = -0.997933  field_max = 12.47 mm
#>   it     2: cost = -0.994687  field_max = 12.49 mm
#>   it     3: cost = -0.990199  field_max = 12.51 mm
#>   it     4: cost = -0.985106  field_max = 12.52 mm
#>   it     5: cost = -0.980346  field_max = 12.51 mm
#>   it     6: cost = -0.978458  field_max = 12.48 mm
#>   it     7: cost = -0.981804  field_max = 12.44 mm
#>   it     8: cost = -0.988480  field_max = 12.35 mm
#>   it     9: cost = -0.995855  field_max = 12.33 mm
#>   it    10: cost = -0.993259  field_max = 12.30 mm  convergence = 8.790e-04
#>   it    11: cost = -0.989656  field_max = 12.28 mm  convergence = 6.711e-04
#>   it    12: cost = -0.990137  field_max = 12.27 mm  convergence = 4.934e-04
#>   it    13: cost = -0.989980  field_max = 12.27 mm  convergence = 3.490e-04
#>   it    14: cost = -0.990185  field_max = 12.26 mm  convergence = 2.364e-04
#>   it    15: cost = -0.989463  field_max = 12.26 mm  convergence = 1.589e-04
#>   it    16: cost = -0.989586  field_max = 12.26 mm  convergence = 1.053e-04
#>   it    17: cost = -0.988753  field_max = 12.27 mm  convergence = 6.173e-05
#>   it    18: cost = -0.988886  field_max = 12.28 mm  convergence = 2.915e-05
#>   it    19: cost = -0.988025  field_max = 12.29 mm  convergence = 2.117e-05
#>   it    20: cost = -0.988119  field_max = 12.30 mm  convergence = 1.504e-05
#>   => max iterations reached (20)  cost=-0.988119
#> [SyN] level 3/3 (shrink=1, sigma=0.0, flow=3.0, channels=2): max 0 iterations
#> [SyN] inverse field: 20 fixed-point iterations, residual mean = 1.23e-01, max = 8.10e+00 voxel
res_mm$transform[1:3, 4]
#> [1]  2.0017331 -1.0002336  0.9990778

# }